frobzwiththingz: (bridgeport)
[personal profile] frobzwiththingz
Well, actually, there have been many days in the shop recently. most of them have been dedicated toward Aerial Rig Mark 2, which i expect to have ready for burning man this year.

Note to self: making your own .25 x .5 x 2 inch structural steel tee section, starting with 2-inch square bar stock, takes damned near forever. I needed 18 inches of the stuff, but it isn't one of the 25 commonly available steel sections. It took roughly 15 hours in total to make the required 3 6-inch sections with holes drilled in the correct places. Next time i'll just alter the design.

That said, the central spider-hub of the new rig is coming together. After tonight, it really looks like progress is being made.



The steel tee-sections are what is joining the arms to the central hub. Much thanks goes to [livejournal.com profile] sensesurfer for access to the Big F'ing CNC Machine i used to cut out the arm sections.



The rig point is on a bearing, so we don't need to use a swivel in our rigging.





not a bad days output.

Date: 2006-06-17 06:43 am (UTC)
From: [identity profile] sensesurfer.livejournal.com
Wow.....that was alot of steel to hog out.

March 2026

S M T W T F S
1234567
891011121314
15161718192021
22232425 262728
293031    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 29th, 2026 06:44 pm
Powered by Dreamwidth Studios